Monday night we met together and tried to finalize the roof and floorplan. We were having a very difficult time getting the right roof structure so I drafted the floorplan and used trace to create different roof shapes. This proved very helpful. Tuesday morning, we met in class and put our different parts together. Rachel had created an exterior wall treatment that gave "mass" to the space. Paige had created triangles to place on the back wall for shelving. I created two planes that together make up the roof. The crit with all 3 professors was helpful but also confusing on how to proceed. We are confident that our ideas are great but the execution and not making the space overworked is still to be seen.